Use Resource Control to Achieve Resource Isolation

As a cluster administrator, you can use the resource control feature to create resource groups, set quotas for resource groups, and bind users to those groups.

The TiDB resource control feature provides two layers of resource management capabilities: the flow control capability at the TiDB layer and the priority scheduling capability at the TiKV layer. The two capabilities can be enabled separately or simultaneously. See the Parameters for resource control for details. This allows the TiDB layer to control the flow of user read and write requests based on the quotas set for the resource groups, and allows the TiKV layer to schedule the requests based on the priority mapped to the read and write quota. By doing this, you can ensure resource isolation for your applications and meet quality of service (QoS) requirements.

  • TiDB flow control: TiDB flow control uses the token bucket algorithm. If there are not enough tokens in a bucket, and the resource group does not specify the BURSTABLE option, the requests to the resource group will wait for the token bucket to backfill the tokens and retry. The retry might fail due to timeout.

  • TiKV scheduling: You can set the absolute priority (PRIORITY) as needed. Different resources are scheduled according to the PRIORITY setting. Tasks with high PRIORITY are scheduled first. If you do not set the absolute priority, TiKV uses the value of RU_PER_SEC of each resource group to determine the priority of the read and write requests for each resource group. Based on the priorities, the storage layer uses the priority queue to schedule and process requests.

Scenarios for resource control

The introduction of the resource control feature is a milestone for TiDB. It can divide a distributed database cluster into multiple logical units. Even if an individual unit overuses resources, it does not crowd out the resources needed by other units.

With this feature, you can:

  • Combine multiple small and medium-sized applications from different systems into a single TiDB cluster. When the workload of an application grows larger, it does not affect the normal operation of other applications. When the system workload is low, busy applications can still be allocated the required system resources even if they exceed the set quotas, so as to achieve the maximum utilization of resources.
  • Choose to combine all test environments into a single TiDB cluster, or group the batch tasks that consume more resources into a single resource group. It can improve hardware utilization and reduce operating costs while ensuring that critical applications can always get the necessary resources.
  • When there are mixed workloads in a system, you can put different workloads into separate resource groups. By using the resource control feature, you can ensure that the response time of transactional applications is not affected by data analysis or batch applications.
  • When the cluster encounters an unexpected SQL performance issue, you can use SQL bindings along with resource groups to temporarily limit the resource consumption of a SQL statement.

In addition, the rational use of the resource control feature can reduce the number of clusters, ease the difficulty of operation and maintenance, and save management costs.

Limitations

Currently, the resource control feature has the following limitations:

  • This feature only supports flow control and scheduling of read and write requests initiated by foreground clients. It does not support flow control and scheduling of background tasks such as DDL operations and auto analyze.
  • Resource control incurs additional scheduling overhead. Therefore, there might be a slight performance degradation when this feature is enabled.

What is Request Unit (RU)

Request Unit (RU) is a unified abstraction unit in TiDB for system resources, which currently includes CPU, IOPS, and IO bandwidth metrics. It is used to indicate the amount of resources consumed by a single request to the database. The number of RUs consumed by a request depends on a variety of factors, such as the type of operations, and the amount of data being queried or modified. Currently, the RU contains consumption statistics for the resources in the following table:

Resource typeRU consumption
Read2 storage read batches consume 1 RU
8 storage read requests consume 1 RU
64 KiB read request payload consumes 1 RU
Write1 storage write batch consumes 1 RU for each replica
1 storage write request consumes 1 RU
1 KiB write request payload consumes 1 RU
SQL CPU 3 ms consumes 1 RU

Estimate RU consumption of SQL statements

You can use the EXPLAIN ANALYZE statement to get the amount of RUs consumed during SQL execution. Note that the amount of RUs is affected by the cache (for example, coprocessor cache). When the same SQL is executed multiple times, the amount of RUs consumed by each execution might be different. The RU value does not represent the exact value for each execution, but can be used as a reference for estimation.

Parameters for resource control

The resource control feature introduces two new global variables.

  • TiKV: you can use the resource-control.enabled parameter to control whether to use request scheduling based on resource groups.

Starting from TiDB v7.0.0, both parameters are enabled by default. The results of the combinations of these two parameters are shown in the following table.

resource-control.enabledtidb_enable_resource_control= ONtidb_enable_resource_control= OFF
resource-control.enabled= trueFlow control and scheduling (recommended)Invalid combination
resource-control.enabled= falseOnly flow control (not recommended)The feature is disabled.

For more information about the resource control mechanism and parameters, see RFC: Global Resource Control in TiDB.

How to use resource control

This section describes how to use the resource control feature to manage resource groups and control the resource allocation of each resource group.

Estimate cluster capacity

Before resource planning, you need to know the overall capacity of the cluster. TiDB provides the statement CALIBRATE RESOURCE to estimate the cluster capacity. You can use one of the following methods:

You can view the Resource Manager page in TiDB Dashboard. For more information, see CALIBRATE RESOURCE.

Manage resource groups

To create, modify, or delete a resource group, you need to have the SUPER or RESOURCE_GROUP_ADMIN privilege.

You can create a resource group for a cluster by using CREATE RESOURCE GROUP.

For an existing resource group, you can modify the RU_PER_SEC option (the rate of RU backfilling per second) of the resource group by using ALTER RESOURCE GROUP. The changes to the resource group take effect immediately.

You can delete a resource group by using DROP RESOURCE GROUP.

Create a resource group

The following is an example of how to create a resource group.

  1. Create a resource group rg1. The resource limit is 500 RUs per second and allows applications in this resource group to overrun resources.

    CREATE RESOURCE GROUP IF NOT EXISTS rg1 RU_PER_SEC = 500 BURSTABLE;
  2. Create a resource group rg2. The RU backfill rate is 600 RUs per second and does not allow applications in this resource group to overrun resources.

    CREATE RESOURCE GROUP IF NOT EXISTS rg2 RU_PER_SEC = 600;
  3. Create a resource group rg3 with the absolute priority set to HIGH. The absolute priority currently supports LOW|MEDIUM|HIGH. The default value is MEDIUM.

    CREATE RESOURCE GROUP IF NOT EXISTS rg3 RU_PER_SEC = 100 PRIORITY = HIGH;

Bind resource groups

TiDB supports three levels of resource group settings as follows.

  • User level. Bind a user to a specific resource group via the CREATE USER or ALTER USER statement. After a user is bound to a resource group, sessions created by the user are automatically bound to the corresponding resource group.
  • Session level. Set the resource group for the current session via SET RESOURCE GROUP.
  • Statement level. Set the resource group for the current statement via RESOURCE_GROUP() Optimizer Hint.

Bind users to a resource group

The following example creates a user usr1 and binds the user to the resource group rg1. rg1 is the resource group created in the example in Create Resource Group.

CREATE USER 'usr1'@'%' IDENTIFIED BY '123' RESOURCE GROUP rg1;

The following example uses ALTER USER to bind the user usr2 to the resource group rg2. rg2 is the resource group created in the example in Create Resource Group.

ALTER USER usr2 RESOURCE GROUP rg2;

After you bind users, the resource consumption of newly created sessions will be controlled by the specified quota (Request Unit, RU). If the system workload is relatively high and there is no spare capacity, the resource consumption rate of usr2 will be strictly controlled not to exceed the quota. Because usr1 is bound by rg1 with BURSTABLE configured, the consumption rate of usr1 is allowed to exceed the quota.

If there are too many requests that result in insufficient resources for the resource group, the client's requests will wait. If the wait time is too long, the requests will report an error.

To unbind users from a resource group, you can simply bind them to the default group again as follows:

ALTER USER 'usr3'@'%' RESOURCE GROUP `default`;

For more details, see ALTER USER ... RESOURCE GROUP.

Bind the current session to a resource group

By binding a session to a resource group, the resource usage of the corresponding session is limited by the specified usage (RU).

The following example binds the current session to the resource group rg1.

SET RESOURCE GROUP rg1;

Bind the current statement to a resource group

By adding the RESOURCE_GROUP(resource_group_name) hint to a SQL statement, you can specify the resource group to which the statement is bound. This hint supports SELECT, INSERT, UPDATE, and DELETE statements.

The following example binds the current statement to the resource group rg1.

SELECT /*+ RESOURCE_GROUP(rg1) */ * FROM t limit 10;

Disable resource control

  1. Execute the following statement to disable the resource control feature.

    SET GLOBAL tidb_enable_resource_control = 'OFF';
  2. Set the TiKV parameter resource-control.enabled to false to disable scheduling based on the RU of the resource group.

Monitoring metrics and charts

TiDB regularly collects runtime information about resource control and provides visual charts of the metrics in Grafana's TiDB > Resource Control dashboard. The metrics are detailed in the Resource Control section of TiDB Important Monitoring Metrics.

TiKV also records the request QPS from different resource groups. For more details, see TiKV Monitoring Metrics Detail.

You can view the data of resource groups in the current RESOURCE_GROUPS table in TiDB Dashboard. For more details, see Resource Manager page.

Tool compatibility

The resource control feature does not impact the regular usage of data import, export, and other replication tools. BR, TiDB Lightning, and TiCDC do not currently support processing DDL operations related to resource control, and their resource consumption is not limited by resource control.

FAQ

  1. Do I have to disable resource control if I don't want to use resource groups?

    No. Users who do not specify any resource groups will be bound to the default resource group that has unlimited resources. When all users belong to the default resource group, the resource allocation method is the same as when the resource control is disabled.

  2. Can a database user be bound to several resource groups?

    No. A database user can only be bound to one resource group. However, during the session runtime, you can use SET RESOURCE GROUP to set the resource group used by the current session. You can also use the optimizer hint RESOURCE_GROUP() to set the resource group for the running statement.

  3. What happens when the total resource allocation (RU_PER_SEC) of all resource groups exceeds the system capacity?

    TiDB does not verify the capacity when you create a resource group. As long as the system has enough available resources, TiDB can meet the resource requirements of each resource group. When the system resources exceed the limit, TiDB prioritizes satisfying requests from resource groups with higher priority. If requests with the same priority cannot all be met, TiDB allocates resources proportionally according to the resource allocation (RU_PER_SEC).

See also

Was this page helpful?