Best Practices of Data Migration in the Shard Merge Scenario
This document describes the features and limitations of TiDB Data Migration (DM) in the shard merge scenario and provides a data migration best practice guide for your application (the default "pessimistic" mode is used).
Use a separate data migration task
In the Merge and Migrate Data from Sharded Tables document, the definition of "sharding group" is given: A sharding group consists of all upstream tables that need to be merged and migrated into the same downstream table.
The current sharding DDL mechanism has some usage restrictions to coordinate the schema changes brought by DDL operations in different sharded tables. If these restrictions are violated due to unexpected reasons, you need to handle sharding DDL locks manually in DM, or even redo the entire data migration task.
To mitigate the impact on data migration when an exception occurs, it is recommended to merge and migrate each sharding group as a separate data migration task. This might enable that only a small number of data migration tasks need to be handled manually while others remain unaffected.
Handle sharding DDL locks manually
You can easily conclude from Merge and Migrate Data from Sharded Tables that DM's sharding DDL lock is a mechanism for coordinating the execution of DDL operations to the downstream from multiple upstream sharded tables.
Therefore, when you find any sharding DDL lock on DM-master
through show-ddl-locks
command, or any unresolvedGroups
or blockingDDLs
on some DM-workers through query-status
command, do not rush to manually release the sharding DDL lock through unlock-ddl-lock
commands.
Instead, you can:
- Follow the corresponding manual solution to handle the scenario if the failure of automatically releasing the sharding DDL lock is one of the listed abnormal scenarios.
- Redo the entire data migration task if it is an unsupported scenario: First, empty the data in the downstream database and the
dm_meta
information associated with the migration task; then, re-execute the full and incremental data replication.
Handle conflicts between primary keys or unique indexes across multiple sharded tables
Data from multiple sharded tables might cause conflicts between the primary keys or unique indexes. You need to check each primary key or unique index based on the sharding logic of these sharded tables. The following are three cases related to primary keys or unique indexes:
- Shard key: Usually, the same shard key only exists in one sharded table, which means no data conflict is caused on shard key.
- Auto-increment primary key:The auto-increment primary key of each sharded tables counts separately, so their range might overlap. In this case, you need to refer to the next section Handle conflicts of auto-increment primary key to solve it.
- Other primary keys or unique indexes: you need to analyze them based on the business logic. If data conflict, you can also refer to the next section Handle conflicts of auto-increment primary key to solve it.
Handle conflicts of auto-increment primary key
This section introduces two recommended solutions to handle conflicts of auto-increment primary key.
Remove the PRIMARY KEY
attribute from the column
Assume that the upstream schemas are as follows:
CREATE TABLE `tbl_no_pk` (
`auto_pk_c1` bigint(20) NOT NULL,
`uk_c2` bigint(20) NOT NULL,
`content_c3` text,
PRIMARY KEY (`auto_pk_c1`),
UNIQUE KEY `uk_c2` (`uk_c2`)
) ENGINE=InnoDB DEFAULT CHARSET=latin1
If the following requirements are satisfied:
- The
auto_pk_c1
column has no impact on the application and does not depend on the column'sPRIMARY KEY
attribute. - The
uk_c2
column has theUNIQUE KEY
attribute, and it is globally unique in all upstream sharded tables.
Then you can perform the following steps to fix the ERROR 1062 (23000): Duplicate entry '***' for key 'PRIMARY'
error that is possibly caused by the auto_pk_c1
column when you merge sharded tables.
Before the full data migration, create a table in the downstream database for merging and migrating data, and modify the
PRIMARY KEY
attribute of theauto_pk_c1
column to normal index.CREATE TABLE `tbl_no_pk_2` ( `auto_pk_c1` bigint(20) NOT NULL, `uk_c2` bigint(20) NOT NULL, `content_c3` text, INDEX (`auto_pk_c1`), UNIQUE KEY `uk_c2` (`uk_c2`) ) ENGINE=InnoDB DEFAULT CHARSET=latin1Add the following configuration in
task.yaml
to skip the check of auto-increment primary key conflict:ignore-checking-items: ["auto_increment_ID"]Start the full and incremental data replication task.
Run
query-status
to verify whether the data migration task is successfully processed and whether the data from the upstream has already been merged and migrated to the downstream database.
Use a composite primary key
Assume that the upstream schemas are as follows:
CREATE TABLE `tbl_multi_pk` (
`auto_pk_c1` bigint(20) NOT NULL,
`uuid_c2` bigint(20) NOT NULL,
`content_c3` text,
PRIMARY KEY (`auto_pk_c1`)
) ENGINE=InnoDB DEFAULT CHARSET=latin1
If the following requirements are satisfied:
- The application does not depend on the
PRIMARY KEY
attribute of theauto_pk_c1
column. - The composite primary key that consists of the
auto_pk_c1
anduuid_c2
columns is globally unique. - It is acceptable to use a composite primary key in the application.
Then you can perform the following steps to fix the ERROR 1062 (23000): Duplicate entry '***' for key 'PRIMARY'
error that is possibly caused by the auto_pk_c1
column when you merge sharded tables.
Before the full data migration, create a table in the downstream database for merging and migrating data. Do not specify the
PRIMARY KEY
attribute for theauto_pk_c1
column, but use theauto_pk_c1
anduuid_c2
columns to make up a composite primary key.CREATE TABLE `tbl_multi_pk_c2` ( `auto_pk_c1` bigint(20) NOT NULL, `uuid_c2` bigint(20) NOT NULL, `content_c3` text, PRIMARY KEY (`auto_pk_c1`,`uuid_c2`) ) ENGINE=InnoDB DEFAULT CHARSET=latin1Start the full and incremental data migration task.
Run
query-status
to verify whether the data migration task is successfully processed and whether the data from upstream has already been merged and migrated to the downstream database.
Special processing when the upstream RDS contains sharded tables
If the upstream data source is an RDS and it contains sharded tables, the table names in MySQL binlog might be invisible when connecting to a SQL client. For example, if the upstream is a UCloud distributed database, the table name in the binlog might have an extra prefix _0001
. Therefore, you need to configure table routing based on the table names in binlog, instead of those in the SQL client.
Create/drop tables in the upstream
In Merge and Migrate Data from Sharded Tables, it is clear that the coordination of sharding DDL lock depends on whether the downstream database receives the DDL statements of all upstream sharded tables. In addition, DM currently does not support dynamically creating or dropping sharded tables in the upstream. Therefore, to create or drop sharded tables in the upstream, it is recommended to perform the following steps.
Create sharded tables in the upstream
If you need to create a new sharded table in the upstream, perform the following steps:
Wait for the coordination of all executed sharding DDL in the upstream sharded tables to finish.
Run
stop-task
to stop the data migration task.Create a new sharded table in the upstream.
Make sure that the configuration in the
task.yaml
file allows the newly added sharded table to be merged in one downstream table with other existing sharded tables.Run
start-task
to start the task.Run
query-status
to verify whether the data migration task is successfully processed and whether the data from upstream has already been merged and migrated to the downstream database.
Drop sharded tables in the upstream
If you need to drop a sharded table in the upstream, perform the following steps:
Drop the sharded table, run
SHOW BINLOG EVENTS
to fetch theEnd_log_pos
corresponding to theDROP TABLE
statement in the binlog events, and mark it as Pos-M.Run
query-status
to fetch the position (syncerBinlog
) corresponding to the binlog event that has been processed by DM, and mark it as Pos-S.When Pos-S is greater than Pos-M, it means that DM has processed all of the
DROP TABLE
statements, and the data of the table before dropping has been migrated to the downstream, so the subsequent operation can be performed. Otherwise, wait for DM to finish migrating the data.Run
stop-task
to stop the task.Make sure that the configuration in the
task.yaml
file ignores the dropped sharded table in the upstream.Run
start-task
to start the task.Run
query-status
to verify whether the data migration task is successfully processed.
Speed limits and traffic flow control
When data from multiple upstream MySQL or MariaDB instances is merged and migrated to the same TiDB cluster in the downstream, every DM-worker corresponding to each upstream instance executes full and incremental data replication concurrently. This means that the default degree of concurrency (pool-size
in full data migration and worker-count
in incremental data replication) accumulates as the number of DM-workers increases, which might overload the downstream database. In this case, you need to conduct a preliminary performance analysis based on TiDB and DM monitoring metrics and adjust the value of each concurrency parameter. In the future, DM is expected to support partially automated traffic flow control.